Laserfiche WebLink
_,~ <br />;, <br />' (SCHEDULE IO NOTICE OF vICLATION) <br />Notice of violation No. NOV - ___8¢2Q_________r___ <br />'MATURE OF VIOLaTIO.V <br />Not followin,~the mine_elan_as described_in hermit 1179_60• and failure to __ <br />"remove the topsoil from the land in a separate_l~er~___~9r_~__~_o~hey==__ <br />---------- ------------ <br />strata ._._ able to sup ort vegetation." <br />ACi OR PERMIT PRDVISiOr:(S) VIOLATED <br />ACT SECTIOr:(S)_34_33_1205~ _________________________________ <br />.e <br />PERMIT SECTION(S)Permit_I179=60___Exhibit U _ The MiII~3~-.~.lChlhlt~ ~1~C115Si4II.~_ <br />about topsoil removal as supported by Exhibit I. <br />PJRT[ON OF THE OPERATION TD '.JHlCH THIS NOTICE 4PPLIES <br />The area where the operator constructed an oserationslmaintenance area below the ____ <br />----------------- ----------- ------------- <br />Anchor seam bench. <br />------------------------------------------------------------------------- <br />STEPS NECESSaRV TO agaTE VIOLATION (REMEDIaL aCiiON) <br />Submit technical revision to Mined Land Reclamation Division. <br />------------------------------------------------------------------------- <br />------------------------------------------------------------------------- <br />------------------------------------------------------------------------- <br />TIME FOR a9ATEMENT (NOT MORE THAN 90 DAYS): <br />Submit technical revision within 30 days of receipt of this notice. <br />------------------------------------------------------------------------- <br />Discussion: <br />The operator constructed the area in question below the Anchor seam without consulting <br />the Mined Land Reclamation staff or applying for a technical revision or amendment. <br />Some topsoil was saved lout it is evident that some soil was not saved. The amount <br />not saved is difficult to determine. Civen the environmental nature of the mine site, <br />it is imperative that all available soil able to support vegetation be saved. The <br />soils analysis in the permit and the inspections have found that generally on the <br />site there is a salvageable A & B horizon. In this particular area it is not known _ <br />how much available soil there was. A technical revision request would have raised <br />that point and a soils analysis would have solved it. Failure to meet an admini- <br />strative requirement resulted in a performance standard violation, <br />CNR/LU0OD5/905 <br />