Laserfiche WebLink
,. , . <br />REC~11l~D <br />Red Canyon Mines <br />Permit C-81-034 <br />Refuse Pile Upper Diversion Ditch <br />Construction Certification <br />,~ ~, '_ ?995 <br />Division of Minerals 8 Gaoloyy <br />Grand Jun~u~ <br />The design of the refuse pile upper diversion ditch is presented <br />on permit pages 100, 101, Tables 2.05.3(4)(d)-9 through 12 and <br />drawing 2.05.3(4-2a. The refuse pile upper division ditch was <br />constructed during the first week of October 1994. Erosion <br />control matting was installed in stretches of the ditch during <br />May 1995. To the best of my knowledge and belief, the refuse <br />pile upper divers ~jj~j~c~i was constructed to meet all applicable <br />performance s ;~~re~5•Ser~go;sign criteria. <br />~ s7a~ e~i s E. Sher, P.E. Date <br />•~~gisterec~~ ~6fessional Engineer <br />•~et~~~q~.~~brado No. 19230 <br />•~~.ONp-;~~r <br />