My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003-12-01_REVISION - M1987092
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987092
>
2003-12-01_REVISION - M1987092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:47:36 PM
Creation date
11/21/2007 1:22:19 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987092
IBM Index Class Name
Revision
Doc Date
12/1/2003
Doc Name
Response to Reclamation Permit Appl. Consideration
From
OSE
To
DMG
Type & Sequence
AM1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department of Natural Resources <br />~~ <br />OF//e~~~(~~O <br />h o <br />r <br />\ r~~'i%e. rlss~ ~ i <br />\896/ <br />1313 Sherman Stree[, Room 818 <br />Denver, Colorado 80203 <br />Phone (303) 866-3581 <br />FAX (303) 866-3589 <br />www.watecstate.co.us <br />Response to Reclamation Permit Application Consideration <br />DATE: December 1, 2003 <br />TO: Carl B. Mount, Senior Environmental Protection Specialist D~ C~ ~ <br />CC: Division 1 Office, District 4 Water Commissioner <br />Bill Owens <br />Governor <br />Greg E Wal<her <br />&ecutive Director <br />Hal D. Simpson, P.E. <br />State Engineer <br />FROM: loans Comaniciu, E.I. <br />RE: ilP No M-1987-092-AM1 <br />era or: B & G Stone <br />Contact: Jordan C. Burdick-303-823-5943 <br />Section 31, Twp 4 North, Rng 70 West, 6th P.M., Larimer County <br />CONDITIONS FOR APPROVAL <br />® The proposed amendment to the existing operation does not anticipate exposing groundwater. <br />Therefore, exposure of ground water must not occur during or after mining operations. The purpose of <br />this amendment is to increase the permitted mining area from 5 acres to 9.9 acres. <br />^ The proposed operation will consume ground water by: ^evaporation, ^ dust control, ^reclamation, <br />^water removed in the mined product, ^ processing, ^ other: <br />Prior to initiation of these uses of ground water, the applicant will need to obtain either a gravel pit or <br />other type of well permit, as applicable. However, prior to obtaining a permit, an approved water supply <br />plan or decreed plan for augmentation is required. <br />^ Prior to approving a well permit, the applicant must conduct a field inspection of the site and document <br />the locations of all wells within 600 feet of the permit area. The applicant must then obtain a waiver of <br />objection from all well owners with wells within 600 feet of the permit area or request a hearing before <br />the State Engineer. <br />^ The proposed operation may have potential impact on existing water rights near the project location. <br />Applicant needs to demonstrate that the proposed project will not alter or impact the historic operation of <br />existing water rights. <br />^ The applicant has indicated plans to use other water for purposes at the permit site. The source <br />of water for this use is to be obtained from Applicant needs to document that this water was <br />diverted in priority under a water right decreed for such industrial use. Applicant should contact the <br />water commissioner for further information. <br />® The applicant has not identified any proposed use of water at the permit site. If water will be used for <br />any purpose at this site, the applicant will need to document that the water was obtained from a legal <br />source, or the water was diverted in priority under a water right decreed for such industrial use. <br />COMMENTS: If stormwater runoff is intercepted by this operation and is not diverted or captured in priority, it <br />must be released to the stream system within 72 hours. This may require a discharge permit from CDPHE- <br />WOCD. Otherwise, the operator will need to make replacements for evaporation. <br />The applicant may contact the State Engineer's Office with any questions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.