My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-01-09_REVISION - M1981279
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981279
>
1997-01-09_REVISION - M1981279
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 5:52:28 AM
Creation date
11/21/2007 1:22:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981279
IBM Index Class Name
Revision
Doc Date
1/9/1997
Doc Name
RECEIPT OTERO CNTY HANCOCK PIT AMENDED 112 PERMIT APPLICATION
From
DMG
To
OTERO CNTY
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />• EXHIBIT "E" <br />3.1.1 Establish Poat-Mining Use <br />(i) The Operator (Otero County) in agreement with the Property <br />Owner (Lee and Eleanor Hancock) plan to reclaim the affected lands <br />for range land and pasture land. The area will be seeded for range <br />land. <br />(ii) The results of these decisions will be covered as specified <br />in Subsections 6.3.9 and 6.4.5 as part of plan Exhibit "E" of this <br />application, of which this is a part, had all of these decision <br />formulated into what the operator believes is an adequate <br />Reclamation Plan. <br />3.1.2 Reclaimine Substituted Land <br />No substitute land will be involved within the operation. <br />• 3.1.3 Time Limit and Phased Reclamation <br />All reclamation shall be carried to completion by the Operator with <br />all reasonable diligence, and each phase of reclamation shall be <br />completed within five years from the date the operator informs the <br />Board or Office such phase has commenced. <br />3.1.4 Public Use <br />The Operator and Land Owner will not allow the public to use the <br />private pasture land. <br />3.1.5 Reclamation Measures - Material Handling <br />(1) Grading shall be carried on so as to create a final topography <br />appropriate to the final land use selected in the Reclamation Plan <br />(pasture land). <br />(2) When back filling is a part of the plan....... <br />No back filling is planned or proposed and there is no acid forming <br />toxic materials to be leached. <br />(3) All grading will be done in a manner to control erosion and <br />siltation of the affected lands, to protect areas outside the <br />affected lands from slides and other damages. If not eliminated, <br />• all high walls shall be stabilized. <br />(4) T}~e OL~erat.or will back fill and grade as soon as feasible <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.