Laserfiche WebLink
.:~ <br />THE PITTSBURG & MIDWAY COAL MINING CO. <br />A Chevron Company <br />P.0. Box 176 <br />Oak Creek, Colorado 80467 <br />Phone' (303) 736-8111 <br />iii iiiiiiiiiiiuiii <br />RECFivF=~.; <br />JUL 2 5 1994 <br /> <br />Ms. Susan Burgmaier <br />Colorado Division of <br />1313 Sherman Street <br />Room 215 <br />Minerals and Geology <br />July 20, 1994 <br />Denver, Colorado 80203-2273 <br />Dear Ms. Burgmaier, <br />Enclosed are the Edna Mine's June 1994 reports for NPDES monitoring. <br />DMP's 001, 004 and 005 had no discharge during the month. DMP's 002, <br />003 and 006 were sampled during the month. All samples taken were <br />within compliance parameters. <br />CDMG water stations were sampled during the month. In compliance with <br />the current permit, a partial was run on both the ground water stations <br />and the surface stations. A stream flow measurement was not available <br />from TR-b because of the flooding problems due to beaver activity. The <br />new station further north, designated in T.R. 20, should be operational <br />at the end of July. <br />Should you have any questions regarding these reports, please contact <br />me at the Edna Mine. <br />Sincerely, <br />_. <br />D. L. Beverlin <br />Resident Engineer <br />cc: Mine File <br />