Laserfiche WebLink
Colowyo and the Division, for future new pit developments, in-pit <br />sediment control practices will be more fully described in the <br />permit. Attached with this information is a minor revision request <br />to update Section 4.05.5 Sediment Control Measures of the permit. <br />Colowyo proposes in this revision to provide a mechanism to <br />inform the Division as to the non-regulated, in-pit containment <br />structures to be constructed, where necessary, during development <br />of future new pits which is in addition to the information already <br />included in the Division approved permit. <br />