Laserfiche WebLink
-2- <br />The Division maintains that the action taken in this case is appropriate and in <br />accord with OSM Directive INE-27. The required response by the operator will <br />correct the existing permit defect and place the operation in compliance with <br />state regulations. If you have any questions on the above, please contact me. <br />Sincerely, <br />Michael S. Savage <br />Senior Reclamation Specialist <br />MSS/jaw <br />Enclosure(s) <br />cc: (dike Long <br />Larry Routten <br />3960E <br />