Laserfiche WebLink
July 9, 2003 <br />To: Berhan Keffelew~,/~ <br />From: James Dillie ~/jt J~ <br />Re: Review of As-Built Certification Report for Phase Nb, Pregnant Solution Storage Area <br />(PSSA), Cresson Project, M-1980-244 <br />Per your request, and as assigned, I reviewed the certification report for the construction of Phase <br />Nb, PSSA, at the Cresson Project. <br />The report was reviewed to ensure that the approved material and construction specifications, as <br />well as material and construction testing, have been complied with and to ensure that the <br />structure was constructed in accordance with the approved design plan. <br />Appropriate testing protocol was followed during construction, review of weekly construction <br />summaries were completed by the DMG, frequent inspections by the Division (as required in <br />Rule 7.4) provided sufficient DMG oversight to ensure that construction procedures were in <br />compliance with approved permit requirements and specifications and a certified verification <br />was submitted by a P.E. that confines that the facility was constructed in accordance with the <br />approved design plan. <br />Therefore, in my opinion, the operator has complied with Rule 7.3 and I recommend acceptance <br />of the certification report. <br />If you need anything else, let me know. <br />cc: Harry Posey (e-mail) <br />