My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
_REVISION - M1980244 (23)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980244
>
_REVISION - M1980244 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/18/2021 8:01:22 AM
Creation date
11/21/2007 1:19:12 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Revision
Doc Name
Appendix N
From
Cripple Creek & Victor Gold
To
DMG
Type & Sequence
AM8
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
bolder Associates Inc. <br />44 Urion Boulevard, suite 300 <br />Lakewood, CO USA 8G228 <br />Telephone (303) 980-OSAO <br />Fax (303) 985-2080 <br />May 29, 2003 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: 4-INCH LVSC PIPE - RFI NO. 103 <br />Deaz Ron: <br />z .E~S~Cl~lft'S <br />Our Re£ 003-2203 <br />Golder Associates Inc. (Golder) has prepared this letter for the Cripple Creek & Victor Gold Mining <br />Company (CC&V) regazding Request For Information (RFI) No. 103 submitted by Ames <br />Construction. RFI No. 103 addressing the 4-inch perforated Low Volume Solution Collection <br />(LVSC) pipe that was not installed during construction of the Phase IV PSSA. <br />Golder has reviewed the design of the LVSC system with the missing pipe removed and has <br />concluded the following: <br />• The LVSC pipes were originally included in the PSSA design [o augment drainage from the <br />LVSC fill to the LVSC sump. By itself, the LVSC fill permeability is sufficient to transmit <br />potential seepage from the upper liner to the LVSC sump. Using the EPA guidelines for <br />estimating seepage from lined facilities set forth in EPA/530/SW-87-015 and EPA/625/4-89- <br />022, Golder has estimated the LVSC fill has approximately three times more flow capacity <br />than the theoretical seepage from [he upper PSSA liner. <br />• The permeability of the LVSC fill has been tested up to loads equivalent to 590 feet of ore. <br />The lab tests indicate that the permeability of the fill remains at 0.1 centimeters per second <br />(cm/sec) even under [he anticipated ore loads. <br />• The intent of the LVSC pipes was to shorten the flow path to the sump, this is mast important <br />for the western side of the PSSA where the flow paths are significant (on the order of <br />thousands of feet). The 4-inch pipe that was not installed was located in the eastern portion of <br />the PSSA, where the flow paths are the shortest (350 feet). <br />Based on these conclusions, Golder will approve construction of [he Phase IV PSSA sump with [he <br />missing 4-inch LVSC pipe referenced in RFI No. 103. <br />Golder appreciates the ongoing opportunity to provide engineering services for the Cresson Project. <br />Please contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />F. Lupo, Ph.D., P.E. <br />Sr. Project Manager <br />1.\00~3303W100`003]30J.0100.0'/3)5-1LV$C.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.