Laserfiche WebLink
Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />. Lakewood, CO USA 80228 <br />Telephone (303) 980-0540 <br />Fax (303) 985-2080 <br />November 7, 2002 <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 19I <br />2755 State Highway 67 <br />Victor, Colorado 80860 <br />Attention: Mr. Ron Roberts <br />RE: ROCK DRAIN NEAR THE PHASE IVB SUMP <br />Dear Ron: <br />~~ =Golder <br />~Assocu~tes <br />Our Ref: 003-2203 <br />Golder Associates Inc. has prepared this letter for the Cripple Creek & Victor Gold Mining Company <br />(CC&V) documenting the construction of a rock drain within the Phase Nb PSSA sump. <br />On October 19, 2002 Ames Construction, Inc. (Ames) was directed to install a rock drain near the <br />Phase Nb PSSA sump to drain an intermittent seep. Ames excavated a 3' wide by 2' deep by 40' <br />long subgrade trench along the 2H:1 V slope just above the PSSA sump area. The trench was <br />connected to a 14' deep by 4' square sump (see Figure 1, attached). The trench and sump were <br />back511ed with Underdrain Fill (UF), The trench and sump were then covered with approximately 1' <br />of compacted Structural Fill (SF). <br />Golder observed construction of the rock drain. Ames excavated the trench and sump, and placed OF <br />and SF in accordance to the Certifying Engineers' requirements. <br />Golder appreciates the opportunity to provide ongoing CQA services for the Cresson Project. Please <br />contact the undersigned with any questions. <br />Sincerely, <br />GOLDER ASSOCIATES INC. <br />o~`~ <br />o n F. Lupo, PhD., P.E. <br />~~ Sr, Project Manager <br />JFL/dls <br />1:wmzzoPA ~ ON00)320).01 Oo.a5a5a.doc <br />cc: Bob Nichols <br />Kim Morison <br />OFFICES ACROSS ASIA, AUSTRALASIA, EUROPE, NORTH AMERICA, SOUTH AMERICA <br />