Laserfiche WebLink
Table 2 CEMEX Inc Lyons Mine <br />Permit No. M-1977-208 <br />Steel Demolition and Reclamation Cost Bond Calculation <br /> <br />Structure <br />Quantity Grinding Process <br />Units Cost <br />Total Cost <br />Tanks/Hoppers 508,344 ft~ $0.77 $ 391,425 <br />Utility Lines 2,680 If $26.82 $ 71,878 <br />Conveyors I 800 If $31.85 $ 25,480 <br />Conveyors Disposal 445 yd3 $10.00 $ 4,448 <br />Metal Buildings 131,000 ft3 $0.77 $ 100,608 <br />Stairs 18,300 ft' $0.77 $ 14,054 <br />Grating 19,600 ft2 $0.18 $ 3,528 <br />Fencing 300 If $1.94 $ 582 <br />Total Steel Demolition and Transport Cost -Grinding Portion $ 612,003 <br /> Burning Process <br />Structure Quantity Units Cost Total Cost <br />Tanks/Hoppers 85,357 ft1 $0.77 $ 65,725 <br />Utility Lines ~ 2,680 If $26.82 $ 71,878 <br />Conveyors 2,700 If $31.85 $ 85,995 <br />Conveyors Disposal 1,501 yd3 $10.00 $ 15,012 <br />Metal Buildings 748,000 ft3 $0.77 $ 574,464 <br />Stairs 4,600 ft3 $0.77 $ 3,533 <br />Grating 8,600 ftZ $0.18 $ 1,548 <br />Fencing 700 If $1.94 $ 1,358 <br />Total Steel Demolition and Transport Cost - Burning Portion $ 819,512 <br />4/18/03 <br />