Laserfiche WebLink
Table 7 cEMEx, Inc Ly«~s Mine <br />Permif No. M-1977-208 <br />Onsite Disposal Area Construction Bond Calculation <br />Item Quantity Units Cost Total Cost <br />Excavation 1,000 yd~ $ 3.00 $ 3,000 <br />Low Permeability Liner Placement 50,000 ftZ $ 0.40 $ 20,000 <br />Cap Placement 6,000 yd3 $ 15.00 $ 90,000 <br />Total Cost for Disposal Site Construction $ 113,000 <br />4/18/03 <br />