Laserfiche WebLink
Ms. Sandra Bm~vu <br />Division of I~eclamatian, Mining and Safety <br />Page 4 <br />No technical/minor revision is required to remediate this small area of erosion. These efforts continue as <br />part of the ongoing maintenance associated with rill and gully remediation. <br />Abatement Step 3.• No later than August 2, 2007, implement and complete the plan submitted in the technical or minor revision <br />required by Step 2. <br />• SCC will repair the area by August 2, 2007. <br />We respectfully request that NOV CV 2007-002 be vacated. Please contact me at (970) 276-5217 or 84G-3648 at your <br />eazliest convenience. <br />Sincerely, ~// <br />Roy A. Kano <br />Reclamation Manager <br />Seneca Coal Company <br />(attachment) <br />cc: Dan Mathews (DAMS) <br />David Beuy (DAMS) <br />Brian Dunfee (Peabody Energy) <br />Scott Belden (Peabody Energy) <br />Fred Conner (Peabody Energy) <br />