My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32197
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32197
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:20 PM
Creation date
11/21/2007 1:15:53 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
5/3/2001
Doc Name
TWENTYMILE COAL CO FOIDEL CREEK MINE PERMIT C-1982-056 NOV CO CV-2001-004
From
DMG
To
RICHARD MILLS
Violation No.
CV2001004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pf'C <br />8 <br />;~fR: COLORADO I~IVISIf~N OF MT.NERAL'5 AND GEOLOGY <br />1313 Sherman Street, Room 215, De rver, Colorado 80203. (303) 866-3567 <br />SETTLEMENT AGREEMENT <br />NOV/C'O NO.: CV-2001-004 <br />MINE: Foidel Creek Mine <br />PERMITNO.: C-1982-056 <br />OPERATOR/PERMITTEE: <br />DATE ISSUED: March 22, 2001 <br />TYPE OF MINE: Underground/Federal <br />COUNfY: Routt <br />Twentymile Coal Company <br />ATTENTION: Richard A. Mills <br />ADDRESS: 29515 Routt County Road tio. 27 <br />Oak Creek, CO 80467 <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount of Civil <br />Penalty, and the operator requested a confererce thereon, as authorized by C.R.S. 1973 34-33-123(8). The <br />requested conference having been held as requin~d by law, on May 3, 2001, the Division and the operator hereby <br />agree as follows: <br />I. The amount of the penalty shall bf $300.00; <br />2. The penalty shall be paid to the Division by the operator not later than 30 days from <br />[he date this Agreement is signed by all parties; <br />3. Payment of such penalty by [he operator shall constitute a waiver of all further rights <br />to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the closing date of such <br />conference, which date is set forth below oppositt the signature of the Conference Officer. <br />U not signed within ten days, the Division wil I fix the penalty at whatever amount it deems appropriate. The <br />fixed penalty amount will likely be the original penalty assessment, based on the factors referred to in C.R.S. 1973, <br />34-33-123(8)(a). <br />OPERATOR: <br />DATE: <br />sy <br />DNISION OF MINERALS AND GEOLOGY: <br />Officer <br />DATE: a <br />By <br />Division <br />Penalty Adjustment Reviewed <br />[Rule S.Od.3(4)(c)] <br />CRS 3433-123(8)(c) and (d) <br />C evb CIV9t,K.s TAK YYIIII50l_'^_IW PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.