Laserfiche WebLink
`~ ~Izy <br />NOV CODING FORM <br />[C] VIOLATION NO. <br />[C] MINE. OR EXPLORATION ID NO. <br />CATEGORY OF VIOLATION <br />[C] INSPECTION DATE <br />VIOLATION TOPICS <br />[C] PRIMARY TOPIC H B <br />C -9 7 -0 0 S <br />C -8 0 -0 0 7 - <br />V <br />0 7/ I 0/ 9 7 <br />SECONDARY TOPIC S C <br />TERTIARY TOPIC T S <br />AD = ADMINISTRATIVE RD = ROADS <br />AP = AIR RESOURCE PROTECTION RS = RECLAMATION SUCCESS <br />AR = AVAILABILITY OF RECORDS RV = REVEGETATION <br />BG = BACKFILLING AND GRADING SB = SUBSIDENCE <br />CR = CONTEMPORANEOUS RECLAMATION SC = SEDIMENT CONTROL <br />ES = EXCESS SPOIL AND DEV. WASTE SD = SLIDES AND OTHER DAMAGE <br />EX = EXPLOSIVES SF = SUPPORT FACILITIES ON SITE <br />FW = FISH AND WII.DLIFE SM = SIGNS AND MARKERS <br />HB = HYDROLOGIC BALANCE SN = SUPPORT FACILITIES, NOT ON SITE <br />HM = HYDROLOGIC MONITORING SP = SPECIAL CATEGORIES OF MINING <br />MP = GENERAL COMPLIANCE WITH PLAN TS = TOPSOIL <br />PW = PROCESSING WASTE OR = OTHER <br />DATE ISSUED O "1 / Z S / ~ 7 <br />DATE OF ON-SITE HEARING _ _ / _ _ / _ _ <br />VIOLATION DESCRIPTION <br />Failure [o protect hydroloeic balance, failure to orevent additional contributions of suspended <br />solids and sediment to streamflow, failure to seereeate topsoil and subsoils from other materials <br />(50 Spaces) <br />ABATEMENT DUE DATES SEPARATE ABATEMENT DESCRIPTIONS <br />0 8 / 3 1 / 9 7 (I) Remove berm construction material (sediment & cobbles) from the S~vester Gulch sveam <br />(2) Pull berm back away from stream channel & recon tract berm at an aooropriate distance to <br />/ / avoid additional sediment contribution to the stream <br />(3) Reconstruct silt fence <br />_ _ / _ _ ! _ _ (4) Salva,,tr~<~psoil & subsoil beneath the reconstructed berm <br />(5) Reclaim disturbance <br />(50 Spaces) <br />NOTE: [CJ =Required entry for all Notice of Violation Records <br />OPERATOR NOTE: Enter "Nature of Violation" narrative on opposite side into "Narrative Edit" screen. <br />