Laserfiche WebLink
Table 5 ~ 'w <br />Transit M- ' of Pueblo Inc. (West and East Pits) _~ ~, <br />Projected Depletions, Cre~its, and Releases (February 2002- January 2003) <br />2. From Tablc 4, column 8. <br />3. Equals (1) - (2) if> zero, else zero. <br />4. Equals (3) divided by 0.998, based upon a 0.2% transit loss. <br />5. Equals (2)-(1)if>uro, elseuro. <br />6. From Table 3, wlmm~ 8, <br />7. Equals (6) - (5) if> uro, elsc uro. <br />8. Equals (7) divided by 0.98, based upon a 2°/. treasit loss. <br />9. Equals (5) - (0) if> uro, else zero. <br />10. Equals (4)+(8). <br />11. Equals (10) divided by 0.90, based upon a IONo transit loss. <br />