My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE32015
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE32015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:16 PM
Creation date
11/21/2007 1:11:39 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Enforcement
Doc Date
8/24/1995
Doc Name
MEMO MONITORING REQUIREMENTS FOR THE SAN LUIS PROJECT PN M-88-112 BMRI
From
DMG
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />MEMO to Mike Long <br />August 24, 1995 - BMRI <br />Page 2 <br />a) Samples will be analyzed for the parameters shown <br />in the attached Table 3. <br />4) Pursuant to TR-010, the tailings pond and collection pond <br />feeder ditch will be sampled daily. <br />a) Samples will be analyzed onsite for WAD 'and Total <br />cyanide. <br />5) Pursuant to TR-010 and TR-023, samples will be taken five <br />to nine days apart from the tailings exiting the INCO <br />reactor. <br />a) Samples will be analyzed onsite for WAD sand total <br />cyanide. <br />Lab reports for the bi-weekly, quarterly and semi-annual samples <br />are sent to the Division when they become available. If any of the <br />monitoring stations are dry, sampling is not required. <br />weekly and monthly reports are required for the dai y onsite <br />analyses of the tailings pond and the collection pond fe der ditch <br />(paragraph 4 above). <br />Monthly reports are required for the INCO tailing samples <br />(paragraph 5 above). A 30-day rolling average shall be etermined <br />weekly for all the analyses performed during the precedin 30 days. <br />In the event that any weekly 30-day rolling average det rmination <br />is found to exceed 3.8 mg/1 WAD cyanide and/or 4.4 m /1 total <br />cyanide, then certain intermediate response actions are r quired by <br />BMRI. <br />Pursuant to TR-016 and TR-023, ten embankment piezomete s will be <br />monitored monthly. In addition, the flow rate from th tailings <br />impoundment to the collection pond will be monitored mont ly. BMRI <br />will submit a report to the Division in their annual r port. If <br />water is detected in any of the piezometers, BMRI must r port this <br />information to the Division within 5 days. <br />JD/gaw <br />cc: Bruce Humphries <br />James Stevens <br />AL \oss\BMRL~~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.