Laserfiche WebLink
The proposed civil penalty was: <br />History $0.00 <br />Seriousness $500.00 <br />Fault $500.00 <br />Good Faith $250.00 <br />Total $750.00 <br />Seriousness <br />Mr. Savage requested that this component be considered as an <br />administrative violation, since it was the required monthly <br />inspections that were of concern, not any actual on-the-ground <br />problems. I agree. Sun Coal Company failed to conduct a permit <br />requirement. I propose to assess seriousness as an <br />administrative violation for $250.00. The degree to which <br />enforcement was obstructed was low. <br />Fault <br />I agree with the proposed penalty because of the fact that Ms. <br />Burqmaier had mentioned the lack of surveys in two inspection <br />reports. <br />Good Faith <br />I agree with the good faith reduction. Sun Coal Company abated <br />the NOV in the shortest time possible. I consider it an <br />extraordinary effort to gather consultants on the mine site on <br />such short notice and conduct a survey. <br />Settlement Agreement Penalty $500.00 <br />