Laserfiche WebLink
CIRCES Cost Estimating Software <br />Task # : O6a State :Colorado PermiUjob# : M-1979-166 <br />Date : 12/30/2004 County :Delta Abbreviation : none <br />User : DMG Site :Bennett'S Gravel Pit Filename : M166-O6a <br /> <br />Agency or organization name :DMG <br />Permit or other job action :Routine bond recalculation <br />Task description :Spread topsoil over pond perimeter above water level <br /> <br />HOURLY EQUIPMENT COST ;: ;;: <br /> Basic machine : Caf D8R Series 11 - SSU Horsepower : 310 <br /> Blade type :Semi-Universal <br /> Attachment no. t : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $48.82 NA <br /> Operating cosUhour : $66.09 100 <br /> Ripper op. cosUhour : $0.00 0 <br /> Operator cost/hour : $31.76 NA <br /> Total unit cosUhour : $146.67 Total fleet cosUhour : $146.67 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,895 LCY factor : NA volume : 2,895 LCY <br /> <br />Source of estimated volume :134,000 s. f. covered with avg 7" of soil <br />Source of estimated swell factor :NA <br />Average push gradient : 0.00 % (post <br />Average site altitude : 4,930 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top SOiI <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.397 /LCY <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.70 <br />1.00 <br />1.00 <br />1.44 <br />1.00 <br />0.75 <br />Source <br />Adjusted unit production : 369.61 LCY/hr <br />Adjusted fleet production : 369.61 LCY/hr <br />Total job time : 7.83 Hours <br />Total job cost : $1,149 <br />