My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-30_REVISION - M1979166
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1979166
>
2004-12-30_REVISION - M1979166
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:42 AM
Creation date
11/21/2007 1:10:16 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1979166
IBM Index Class Name
Revision
Doc Date
12/30/2004
Doc Name
Cost Estimate
From
DMG
To
File
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 03a <br />Date : 12/30/2004 <br />User : DMG <br />Agency or organization name :DMG <br />Permit or other job action :Routine bond recalculation <br />Task description :Remove alternate haul roads <br />HOURLY EQUIPMENT COST <br />Basic machine : Caf D8R Series II - 8SU <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 : 3-shank ripper <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $48.82 NA <br /> Operating cosUhour : $66.09 100 <br /> Ripper op.cosUhour : $2.13 30 <br /> Operator cosUhour : $31.76 NA <br /> Total unit cosUhour : $148.80 Total fleet cosf/hour : $148.80 <br /> <br />MATERIAL QUANTITIES ;: ;: ; <br />Initial Swell Loose <br />volume : 481 LCY factor : NA volume : 481 LCY <br /> <br />Source of estimated volume :Rip and remove 130' x 25'road avg. 4' deep <br />Source of estimated swell factor:NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,400.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job effciency : 0.83 (1shiWday) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rt) <br /> Push gradient : 1.33 (Cat HB) <br />Average push gradient : 15.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 4,930 feet Material weight : 0.96 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,400 Ibs/LCY Net correction : 0.57 <br />Weight description <br />Clay and gravel -Dry Adjusted unit production : 798.92 LCY/hr <br /> Adjusted fleet production : 798.92 LCY/hr <br />JOB TIME AND COST ~~ <br />Fleet size : 1 Dozers) Total job time : 0.80 Hours <br />Unit cost : $0.186 /LCY Total job cost : $90 <br />State :Colorado <br />County :Delta <br />Site :Bennett'S Gravel Pit <br />PermiUjob# : M-1979-166 <br />Abbreviation :none <br />Filename : M166-03a <br />Horsepower: 310 <br />
The URL can be used to link to this page
Your browser does not support the video tag.