Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task no.: 01a <br />Date : 12/30/2004 <br />User: SSS <br />Agency or organization name DMG <br />Permit or other job action :Routine Bond Recalculation <br />Task description : Dewater pit for slope reduction <br />HOURLY EQUIPMENT COST <br /> <br />Description Quantity Data <br />Source <br />Pump : Centrifugal pump, 12.0 in. 1 (CRGJ <br />Suction hose : Suction pipe, 12 in. diam., 25 ft. L 2 (CRGJ <br />Discharge hose : Discharge pipe, 12 in. D, 25 tt. L 4 (CRGJ <br />Labor: NA 0 NA <br />Cost Breakdown <br />Ownership cost/hour <br />Operating cosUhour: <br />Operator cosUhour: <br />Total cosUhour <br />$0.00 NA <br />$32.03 <br />Job shift basis : 1 per day <br />Horsepower: 90 <br />Weight (UST) : 2.60 <br />TotalfleetcosUhour: $32.03 <br />...................................................... <br />PUMPING QUANTITIES <br />Initial pond Conversion Final pond <br />volume: 76,122,225.00 gallons factor: 1.0000 volume: 76,122,225 gallons <br />Total pond inflow surface Unit inflow rate in <br />area: 15,600 sq. ft. gph/sq.ft.: 0.1758 <br />Source of volume estimate :Assume 9.5 acre pit with 26' deep water <br />................................ <br />.................................. <br />................................... <br />PUMPING TIME <br />PermiUob no.:M-1979-166 <br />Abbreviation :none <br />Filename :M166-O1a <br />Total pond inflow volume <br />per hour : 2, 742.48 <br />Rated pump capacity : 350,000 gph/pump Total pumping capacity : 350,000 gph <br /> Initial unadjusted pumping time : 217.49 hours <br />Inflow as % of pond volume : NA % Inflow during initial pumping timt 596,468 gallons <br /> Net unadjusted pumping time : 219.20 hours <br /> <br /> Pump efficiency factor : 0.9167 (55 min./hr) <br /> Total adjusted pumping time : 239.11 hours <br /> <br />JOB TIME AND COST <br /> Total job time : 239.11 hours <br />Unit cast : $0.000100 per gallon Total job cost : $7,659 <br /> <br />State :Colorado <br />County :Delta <br />Site : Bennett'S Gravel Pi[ <br />Job Utilization <br />$17.19 NA <br />$14.85 100 <br />