Laserfiche WebLink
<br />-3- <br />a. Effect on Permit. In aadition, if it is aetermined that a pattern of <br />violations exists ana that the violations were Caused by unwarranted ;allure to <br />Comply, or were ~aillful, your permit may be suspended or revoked. <br />SCHEDULE TO NOTICE OF VIOLATION <br />r <br />Notice of Violation No. ~~OV C-84-169 <br />MATURE OF VIOLATION: <br />Topsoil had not been salvaged prior to placement of the westernmost <br />overburden stockpile.. In backfilling operations for the Middle Creek <br />Mine pit, the operator did not establish a topsoil buffer zone to permit <br />. regrading of this pile while minimizing the disturbance to the surrounding <br />undisturbed area. The surrounding topsoil was not salvaged and had been <br />disturbed by equipment and overburden spillage. <br />ACT, RtGULATION, OR ?ERrtIT PROVISION(S) VIOLATED: <br />ACT SECTION(S) ~2t(2)(i~, 17n(9~(a~ <br />REGULATION SEOTIONIj) 4,06 <br />?ERriIT SECTION{Sj <br />?ORTION Of THE OPE3ATION TO 'dHICH THIS NOTICE APPLIES: <br />Western Overburden Stockpile and the previously undisturbed area around <br />this stockpile. <br />STEPS NECESSARY TO ABATE VIOLATION (RE~iEDiAL ACTION): <br />Salvage topsoil around the westernmost overburden stockpile creating a <br />buffer zone to allow equipment to remove material from the pile. <br />