2 <br />2. Paragraph 3, page 3 of AFO's letter, referring to a DMG memo, <br />says, "the memo states: '***that currently revegetated portions <br />of the pile meet cover and production success criteria during the <br />9th and 10th years of the bond liability period "'. This indicates <br />it is DMG's position that cover and production standards have been <br />met on portions of the pile. In fact, the DMG memo says, <br />"For the Roadside pile, I would recommend that we <br />conditionally approve the 6 inches cover depth, with the <br />provision that currently revegetated portions of the pile <br />meet cover and production success criteria during the 9th <br />and 10th years of the bond liability period." <br />The DMG memo does not indicate that portions of the pile have meet <br />success criteria, as indicated in the AFO letter. <br />3. Paragraph 1, page 4 of AFO's letter mentions that DMG's <br />response to the TDN did not address field problems outlined in the <br />inspection report. DMG's response addressed the issue of <br />contemporaneous reclamation cited in the TDN. Other problems <br />outlined in the inspection report were not included in the TDN and <br />are not directly relevant to the question of contemporaneous <br />reclamation. Therefore, they do not need to be addressed by DMG in <br />the context of a response to this TDN. We will point out that the <br />items mentioned in AFO's letter are being addressed through NOV's <br />issued during the inspection and subsequent permit revisions. <br />4. Paragraph 2, page 4 of AFO's letter refers to DMG's assertion <br />that reclaiming the refuse piles with four feet of cover at this <br />time would require potentially unnecessary disturbance of a nearby <br />borrow area. AFO goes on to say that DMG is inferring a new <br />concept not included in the Roadside permit. The disturbance DMG <br />referred to was the potentially unnecessary excavation of enough <br />material from the approved borrow area to place four feet of cover <br />on the piles. For example, approximately 89,000 cubic yards of <br />earth are required for one foot of cover on the piles while 371,000 <br />cubic yards are required for four feet of cover. The point of our <br />dsicussion was that placement of four feet of cover on the pile <br />will entail a larger disturbance at the borrow area than placement <br />of a lesser amount of cover. <br />