Laserfiche WebLink
~,: <br />POWDERHORN <br />COAL COMPANY <br />May 29, 1996 <br />III IIIlllllllllllll~ <br />999 <br />P.O Box 7430 <br />Palisade, Colorado 87526 <br />(970) 464-7951 <br />Fa: (970)464-7181 <br />REC~i~~~n <br /> <br />Mr. Dan Mathews <br />Environmental Protection Specialist <br />Colorado Division of Minerals and Geology <br />2148 Broadway, #C-5 <br />Grand Junction, CO 81503 <br />RE: Notice of Violation C-96-010, File C-81-041 <br />Dear Mr. Mathews: <br />Division o1 frig.;.•,!;, & Gv!~pV: <br />Grand.iu;;~Jt, .• <br />In response to the subject NOV, this letter is being written to <br />verify that the second step in the abatement procedure has been <br />met. The pumping system as described in our letter dated May 14, <br />1996, had been installed by the time you were here for an <br />inspection on May 23, 1996. <br />I did get the TSS results from the sample that I took on May 22, <br />1996. As I suspected we were out of compliance. The TSS for <br />outfall 004 of our CDPS discharge permit No. CO-0027146 was 1850 <br />mg/1. I will copy you on the letter of notification to the Health <br />Department which will give further details on this occurrence. <br />Let me know if you have any questions. <br />Sincere y, <br />i /~ <br />Larr~. Reschke <br />Engi eer <br />LMR:lmr <br />cc: Dick Reisinger(WACC) <br />DMG52996 <br />