My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2002-05-20_REVISION - M1995057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995057
>
2002-05-20_REVISION - M1995057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 5:45:31 PM
Creation date
11/21/2007 1:09:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995057
IBM Index Class Name
Revision
Doc Date
5/20/2002
Doc Name
Technical Revision Request
From
Gunnison Gravel
To
DMG
Type & Sequence
TR1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GUNNISON GRAVEL/ <br />P. O. Box 42 <br />Gunnison, CO 81230 <br />(970)641-3088 <br />(970) 641-5811 FAX <br />(970)209-0442 Mobile <br />Bob Oswald <br />Sally Wilcox, Owner <br />Warren Wilcox, Manager <br />~~~ <br />`'~''~~ ~ <br />O~ <br />`~~ <br />April 16, 2002 P,`~s~ <br />?PC <br />eo~~ <br />o~. <br />aeceW~ <br />MpY 14 2p02 <br />~~~p FieW ~G001o9Y <br />p'rl}6bn of Minerals & <br />Environmental Protection Specialist <br />Division of Minerals and Geology <br />701 Camino del Rio, Room 125 <br />Durango, CO 81301 ~ f ~• <br />Re: Rudibaugh Pit, File No. M-95-057 Technical Revision tr~~. ' t[ ~' <br />Dear Mr. Oswald, <br />This letter is being written to request a technical revision to Exhibit C of the <br />Rudibaugh 110 Pit Permit to allow sand washing operations. Any wash equipment maybe <br />used including, but not limited to a sand screw, a wash plant or a sand classifier. Water to <br />be used from the current irrigation ditch and returned to imgation after passing the <br />settlement basin. A small pump sump about four foot square and 30 inches deep will be <br />incorporated into the irrigation ditch currently in place. The settlement pond will be <br />approximately 14 feet wide by 75 feet long and ab-out 2.5 feet deep.-The overflow from <br />the settlement pond back to the imgation ditch will be either C. M. P. or plastic pipe. <br />Enclosed is a check for $188.00 to cover the technical revision fee. <br />Thanks! <br />~~~~~~~~ <br />Warren O. Wilcox V' <br />
The URL can be used to link to this page
Your browser does not support the video tag.