Laserfiche WebLink
<br /> <br />Reclamation Costs <br />Cost to Push Topsoil 175 ft. <br /> 7,260 yd3 x .675 yd3 = 55,513. 22 <br />Cost to Push Overburden 58 ft. <br /> 2,500 yd3 x .233 yd3 = $582. 50 <br />Seed 10 acres @ 8500.00/acre = 55,000 .00 <br />Mobil ization 200/hr for 1 Dozer <br /> and Seeding Equipment x 4 hrs. = S 800. 00 <br />Subto tal = $11,895. 72 <br />+ 15. 8X Overhead = 51,879. 52 <br />TOTAL = S1~.ZZ5_..24 <br />Cost Per Acre on 10 Acre Site 51,377. 52 <br />GRS/ern <br />(5/92) 3247f <br />-2- <br />