Laserfiche WebLink
POWDERHORN <br />COAL COMPANY <br />August 31, 1993 <br />Ms. Erica S. Crosby <br />Reclamation Specialist <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203-2273 <br />RE: NOV C-93-119, File C-81-041 <br />Dear Ms. Crosby: <br />SEe ~ 1993 <br />III IIIIIIIIIIIII III <br />P.O. Box 1430 <br />Palisatla, Coioratlo 81528 <br />)303) 4847951 <br />Fax 1303) 484-7187 <br />aF ~~~~~ ~~~- <br />"~w, <br />ti ,~:. <br />This is to inform you that abatement steps itemized in the <br />subject Nov have been completed. The last of the waste coal <br />fines were hauled to the refuse pile around 11:00 A.M. August 27, <br />1993. <br />As noted on your follow-up inspection August 26, 1993, we were <br />unable to clean the culvert; therefore, we removed it. Once we <br />determine whether a culvert will be necessary at this point <br />during cover of the pile, it will be replaced or a revision will <br />be submitted to leave it out. At the time of this follow-up <br />inspection „ the remaining abatement step was to remove the pile <br />of material cleaned up near the creek. This pile of material was <br />removed the next morning. <br />Please let me know if you have any further questions. <br />Sincerely, <br />C/Later" _y M. Reschke <br />Engineer <br />LMR:jP <br />cc: Brian Dunfee (PWCC) <br />