My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31731
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31731
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:43:09 PM
Creation date
11/21/2007 1:05:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1994082
IBM Index Class Name
Enforcement
Doc Date
5/30/1997
Doc Name
SETTLEMENT AGREEMENT
From
SCC
Violation No.
CV1997004
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iiiiii iiii • • <br />999 <br />MAY 2 7 f~~'p <br />SETTLEMENT AGREEMENT <br />Cessafion Order No.: <br />Notice of Violation No.: C-97-004 <br />Mine: toast Mi <br />Permittee: <br />Mailing Address: <br />Permit No.: C-94-082 <br />Seneca Coal Comoanv <br />P.O. Drawer D <br />Havden. Colorado 81639 <br />Operator: (If other than Permittee): <br />Mailing Address: <br />County: Routt Type of Mine: Surface\Federal <br />The Division of Minerals and Geology ("the Division") issued a certain Notice of Proposed Amount <br />of Civil Penalty, and the operator requested a conference thereon, as authorized by C.R.S. 1973 <br />34-33-123(8). The requested conference having been held as required by law, on <br />Mav 20. 1997 ,the Division and the operator hereby agree as follows: <br />1. The amount of the penalty shall be S 1.850.00 , <br />2. The penalty shall be paid to the Division by the operator not later than 30 days <br />from the date this Agreement is signed by all parties; <br />3. Payment of such penalty by the operator shall constitute a waiver of all further <br />rights to review of such penalty or of the violation on which it is based. <br />This agreement shall not be effective unless signed by the operator within ten days after the <br />closing date of such conference, which date is set forth below opposite the signature of the <br />Conference Officer. If not so signed, the Division will fix the penalty at whatever amount it deems <br />appropriate based upon the factors referred to in C.R.S. 1973, 34-33-123(8)(d). <br />DATE: MAC ' 30.9"] <br />DATE: Mav 21 , 1997 <br />Penalty Adjustment Reviewed <br />(Rule 5.04.31411c11 <br />C.R.S. 3 4-3 3-1 2 31811c1 and Id) <br />OPERATOR:~{SE'NQA CoA~CoMPRiJ'f <br />By ,~ l~ cT~~t ao ~~-P <br />DIVISION OF MINERALS AND GEOLOGY: <br />By f ~ <br />Conference Officer <br />By <br />Division Director <br />m:\c oel\share\f orms15016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.