Laserfiche WebLink
<br />~I~ I~~II~~~~IIII'I~ <br />STATE OF COLORADO <br />DIVISION OF MINERALS AND GEOLOGY <br />Deparmenl of Natural Resources <br />1717 Sherman Sf., Roan 21 S <br />Denver, Colorado 80207 <br />Phone: 1703) 866-7567 <br />FAX: 007) 8328106 <br />January 06, 1997 <br />Fred A. Mueller <br />Siloam Stone <br />1360 Rudd Avenue <br />Canon City, CO 81212 <br />RE: Colorado Refractories Corp., Siloam Mine, Permit No. M-77-326 <br />Dear Mr. Mueller: <br />On December 27, 1996 we conducted an inspection of your mine and found: <br />Mining has occurred outside of the 9.9 acre permit boundary. <br />~~~~~~ <br />DF.PAEITMENC OF <br />NATURAL <br />RESOURCES <br />Roy Rarer <br />GovemOr <br />tames 5. Eochhead <br />Eaeculive Directs <br />Miduel B. long <br />Division DirMOr <br />We believe this is in violation of: either, Section 34-32.5-116(4)(1) or Section 34-32.5-109 of <br />the Colorado Land Reclatnatin Aa for the Extraction of Construction Materials 34-32.5-101. <br />Therefore, we have found reason to believe a violation exists to Permit M-77-326 and the Law <br />and have scheduled this matter before tLe Mined Land Reclamation Board. <br />A Formal Public Hearing will be held during the February 26-27, 1997 Board meeting for <br />consideration of possible violation. The hearing will be held in Room 318 of 1313 Sherman <br />Street, Denver, Colorado, beginning at 9:00 a.m. or as soon thereafter as the matter can be <br />considered and you will have the opportunity to be represented and heard. <br />If the Board fords a violation at this hearing, i[ may issue a cease and desist order, assess a civil <br />penalty in the amount of $100.00 to $1,000.00 or $1,000.00 to $5,000.00 for each day of <br />violation and may order the permit be suspended, modified or revoked. In addition it may set <br />the matter for consideration of forfeiture of the $36,500.00 financial warranty at a subsequent <br />hearing. If you have evidence indicating that the possible violations noted above do not exist <br />or have been corrected, please provide it to us as soon as possible or bring it to the hearing. <br />The attached inspection report(s) list specific dates when corrective actions or remediation of a <br />listed problem shall be corrected by. Please provide us with notice and photographs of the <br />completed work as soon as possible. Prompt correction of the listed problems may significantly <br />reduce any potential civil penalties the Board may levy. <br />