My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-12-02_REVISION - M1977170
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977170
>
2004-12-02_REVISION - M1977170
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:08:26 PM
Creation date
11/21/2007 1:03:56 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977170
IBM Index Class Name
Revision
Doc Date
12/2/2004
Doc Name
Second Copy of TR
From
Butala Construction Company
To
DMG
Type & Sequence
TR2
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DIAL ]19-539-2333 B ~ ~ 'A l A <br /> <br />FAX )19-539-3533 ~ ~ ~ /r ~ ~ ~ ] <br />Division of Minerals & Geology <br />1313 Sherman Street, Rm 215 <br />Denver, CO 81201 <br />Reference: Inspection of Facility: M-1977-170, <br />Located at: 9000 County Road 152, <br />Salida, Colorado 81201 <br />Copy of Inspection Report enclosed <br />POST OFFlCE BOX 90] <br />~ SALIDA. COLORADO 81201 <br />November 19, 2004 <br />Mining Permit: M-1977-170 <br />Operator: Butala Construction Co. <br />I. Item MP: General Mine Plan Compliance: A TECHNICAL REVISION: <br />Our permit requires mining the slopes at 2h: lv gradient. However; <br />experience has shown that in mining the slopes with a loader, the most <br />efficient method is to mine a vertical slope. It is requested via this technical <br />revision, that our permit be modified to indicate vertical slope mining. For <br />reclamation, the slopes will be addressed at a 2h: lv gradient. <br />II. Item SR: Processing Facilities. <br />Containment berms have been constructed around the non-portable fuel tanks <br />as required in the inspection report. All fuelloil spills as noted have been <br />cleaned in accordance with the approved plan. Proof of compliance photos <br />are included as required. <br />Sincerely yours, <br />Frank Butala <br />President/Owner <br />Butala Construction <br />'.T yam.. ~a ~ t <br />'fir ~ ^~_ <br />L '~ ~i. 1~ .::w/rs:. <br />EVERY CONSTRUCTION SERVICE <br />FROM THE GRAFTING BOARD TO THE BUILDING <br />,, <br />;ter " - ; ~ ~; <br />
The URL can be used to link to this page
Your browser does not support the video tag.