My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998-01-10_REVISION - M1988112
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988112
>
1998-01-10_REVISION - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/21/2021 10:19:26 AM
Creation date
11/21/2007 1:03:46 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Revision
Doc Date
1/10/1998
Doc Name
SAN LUIS PROJECT PERMIT AMENDMENT ADEQUACY RESPONSES M-88-112
From
STEFFEN ROBERTSON & KIRSTEN
To
MLRD
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />t BATTLE MOUNTAIN RESOURCES, SAN LUIS PROJECT <br />CMLRD ADEQUACY LETTER RESPONSES <br />Page 11 of 28 <br />16. Section D. 6.1 states that, during Phase 1, 33% of the tailings will <br />be placed in the upper disposal area. Section D. 6.5.3 states that, <br />during Phase 1, the upper area will generate drainage at about 310 <br />gpm, whi 1e the )ower area wi 11 generate about 230 gpm. Please explain <br />' why the Lesser volume of taiiings generates 120 gpm moue water. If <br />these figures were used to evaluate the sizing and spatial placement <br />of the aDS collector pipes, the design should be re-evaluated. It <br />is essential that the drainage system be completely adequate to <br />' transmit flows from the tails to the catchment basin while minimizing <br />the hydraulic head within the facility. <br />' RESPONSE: The quantity difference of 80 gpm is a result of the larger surface <br />area of the upper area and thereby the drainage network under the <br />upper area and is not related to the amount of tailings deposited. <br />The quantities were conservatively calculated assuming that the <br />entire surface area for drainage network for both the upper and lower <br />areas was covered with tailings which exhibited permeabilities <br />similar to permeabilities expected after one year of deposition. <br />First year tailings permeabilities will decrease through <br />consolidation over time. By assuming these high permeabilities over <br />the entire drainage network area and not just the area of first year <br />deposition, the maximum flows were conservatively estimated at 310 <br />gpm for the upper area and 230 gpm for the lower area. <br />In addition, the main collector pipes from the upper impoundment have <br />1 been designed to collect almost four times the conservatively <br />calculated 310 gpm flow or 1200 gm. The main collector pipes from <br />the lower impoundment have been designed to collect over three times <br />1 the 540 gpm total flow or 1800 gpm. Additional capacity is also <br />available in the drainage blanket surrounding the pipe network. <br /> The figures presented represent a conservative design f'or the pipe <br />' network utilizing non-pressurized flow (zero head) and minimum <br /> grades. <br /> IT. The elevations contained on Figures D.6-3 through D.6-..5 should 6e <br />' corrected, and the figures resubmitted. <br /> RESPONSE: The elevations on Figures D.6-3 through D.6-5 have been corrected <br /> and the corrected figures are included with this submittal. <br /> 18. The pond cross-section shown on Figure C-8 indicates a six-inch PVC <br /> pipe will be used for the teak detection sump. The construction <br />' details provided in Appendix J state that an eight-incA pipe will <br /> be used. Please clarify. <br />' RESPONSE: The correct PVC pipe diameter shown on Figure C-8 should be 8" as <br /> stated in the construction details. The figure has been corrected. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.