Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name :ORMS <br />Task # : 05a State :Colorado <br />Date : 09/12/2006 County :Gunnison <br />User : GRM Site : Rudibaugh Pit <br />sheet 1 of 2 <br />Permit or other job action :2006 Reclamation Liability Update <br />task description :Initial Mobilization fo Site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : Y per day <br /> Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T , 50T, and 100T) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 $18.37 $22.33 <br /> Operating cost/hour : $44.38 $46.13 $50.07 <br /> Operator cosUhour : $27.66 $27.66 $27.66 <br /> Helpercost/hour: $0.00 $25.39 $25.39 <br /> Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description WeighUunit <br />(Tons) Ownership <br />CosUhdunit Haul Rig <br />Cost/hdunit Fleet Size <br />(No, units) Haul Trip <br />CosUhr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Costlfleet <br />-Cat D6R LGP - 6S (2003) 28.39 $28.55 $117.55 1 $146.10 $117.55 $0.00 <br />-CAT 12H 14.42 $21.33 $88.67 1 $110.00 $88.67 $0.00 <br />-reveg tractor 10.00 $25.00 $88.67 1 $113.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $369.77 $294.89 ~ $0.00 <br />PermiUjob # : M-1995-057 <br />Abbreviation :none <br />Filename : M057-05a <br />