My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-09-13_REVISION - M1995057
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1995057
>
2006-09-13_REVISION - M1995057
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:42 AM
Creation date
11/21/2007 1:01:40 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1995057
IBM Index Class Name
Revision
Doc Date
9/13/2006
Doc Name
Periodical Financial Warranty Review Increase Notice
From
DRMS grm
To
Deb and Rudy Rudibaugh
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT <br />Machine <br />-Flatbed Truck, 4x2, 15K GVW <br />Total Fleet Size Haul Trip <br />~Uhour/unit (No. units) CosVhr/fleet <br />$48.11 <br />1 I $48.11 <br />Subtotals :~ $48.11 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest m ajor city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br /> Roadable Roadable Average travel speed <br /> Equipment Equipment <br />Haul time (hours) = 0.51 0.51 Total non-roadable mob/demob cost ' <br />Return time (hours) = 0.51 0.51 ' Rvo round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost " <br />Unloading time (hours) = 0.50 NA "one rountl trip, no haul rig <br />Subtotals = 2.03 1.03 <br />sheet 2 of 2 <br />Return Trip <br />Cosdhr/fleet <br />$48.11 <br />11 <br />Gunnison <br />18.0 miles <br />35.0 mph <br />$435.46 <br />$49.49 <br />JOB TIME AND COST Total job time : 4.06 hours <br />Total job cost : $485 <br />
The URL can be used to link to this page
Your browser does not support the video tag.