Laserfiche WebLink
<br />-~- <br /> <br />3. Rowe shall comply with the following CORRECTIVE ACTION: <br />• Post an interim reclamation bond in the amount of $5000.00 by June 22, 1999. <br />• Secure a Limited Impact 110 permit by July 28, 1999. <br />4. Rowe is hereby assessed a CIV1L PENALTY of $1000.00 per day for 3? days of <br />violation, totaling $37,000.00, pursuant to Section 34-32.5-123(2), C.R.S., and $37.93 per hour for 10 <br />hours of staff time, pursuant to Section 34-32.5-123(4), C.R.S. Of the civil penalty, all but $1379.30 is <br />suspended pending compliance with the corrective action outlined above. The unsuspended portion <br />of the Civil Penalty shall be paid within 30 days of the signature date of this Order. <br />The rights and obligations of recipients of a Notice of Violation/Cease and Desist Order are described <br />in the Colorado Land Reclamation Act for the Extraction of Construction Materials, Sections 34-32.5- <br />101 et sec ._, Colorado Revised Statutes. <br />Nothing contained herein, particularly those portions requiring certain acts to be performed <br />within a certain time, shall be construed as a permit or license to engage in any prospecting or <br />mining operations within the State of Colorado. <br />Dated this _ day of Lune, 1999 <br />COLORADO MINED LAND RECLAMATION BOARD <br />DEPARTMENT OF NATURAL RESOURCES <br />FOR THE BOARD: <br />BY: <br />MICHAEL B. LONG, Director ~% („~ I u ~ s L <br />Division of Minerals and Geology ~7`~ <br />M:bsslpmm\boud ordcrs\m99-018nos'sss.doc <br />