My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2006-01-03_REVISION - M1989004 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1989004
>
2006-01-03_REVISION - M1989004 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:04 PM
Creation date
11/21/2007 1:00:45 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1989004
IBM Index Class Name
Revision
Doc Date
1/3/2006
Doc Name
Incompleteness
From
DMG sme
To
Kit Carson County
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_?- <br />F.xHtt3iT F. -Mar (Rule 63.51: (I) ht addition to the requirements of 6.2.1(2), you must provide a map that <br />cleazly describes the features associated with the mining plan and the components of the Reclamation Plan. <br />Include one map for the mine plan and one map for the Reclamation Plan. The map(s) must be drawn to a scale <br />no smaller than appropriate to clearly show all elements that are requited to be delineated by the Act and these <br />Rules; show a north arrow, note any section comers adjacent to the proposed operation, and indicate the date <br />illustrated. At a minimum, maps must include the following information: <br />(2) Mining Plan Man <br />(a) outline and label the permit boundaries, described in Exhibit A -Legal Description; for all <br />Limited Impact 110 and Special 111 Operations, the Office considers the area bounded by the permit boundary to <br />be analogous to the affected area; <br />(b) label the names of owner(s) of record of the surface of the affected azea, of the land within two <br />hundred (200) feet of the affected area, identify the owner of the substance to be mined, and the type of structure <br />and owners of record of any permanent or man-made structures within 200 feet of the affected area; <br />(c) outline and label all major surface features to be used in connection with the proposed operation <br />such as: existing and proposed roads, pit boundary, topsoil stockpiles, overburden stockpiles, product stockpiles, <br />waste rock fills, stream channels, buildings, processing plant, underground openings such as adits or ventilation <br />facilities, ponds, impoundments, dewatering pumps, diversions, tail or waste disposal areas; <br />(d) indicate the direction that mineral extraction will proceed; <br />(e) note the location of any significant, valuable, and permanent man-made structures within two <br />hundred (200) feet of the affected area such as houses, barns, fences, above or below ground utilities, irrigation <br />ditches, maintained or public roads, bridges, wells, pipelines, water storage impoundments, railroad tracks, <br />cemeteries, and communication antermas. A narrative description must be provided in Exhibit B -Site <br />Description; and <br />(f) outline and label existing disturbance within and/or adjacent to the pennit boundary (e.g., <br />previously mined azeas, roads or excavations resulting from utility construction), Re-disturbance of previously <br />disturbed areas, by the proposed mining operation, must be included in the pemut area and addressed in Exhibit <br />D -Reclamation Plan. <br />(3) Reclamatinn Plan Man <br />(a) show the gradient of all reclaimed slopes (horizontal:vertical) sufficient to describe the post <br />mine topography; <br />(b) indicate where vegetation will not be established and the general area(s) for shrub or tree <br />planting; <br />(c) if ponds are a part of the Reclamation Plan, outline the fmal shore configuration of the ponds <br />and shallow areas if the future land use is for wildlife; <br />(d) state the average thickness of replaced overburden by reclamation area or phase; and <br />(e) state the average thickness of replaced topsoil by reclamation azea or phase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.