process. A 2.8 to 1 horizontal to vertical slope gradient <br />will be maintained during the construction of the tailings <br />dam, which will be raised in successive stages to a maximum <br />height of 30 feet. When the tailings impoundment dam has <br />reached its storage capacity, it will occupy a rectangular <br />area that will have the dimensions 400 feet by 260 feet at its <br />longest and widest points. <br />This milling complex has been designed to maintain a stable <br />water balance throughout the ore processing and tailings <br />impoundment system. The milling operation will require 4 tons <br />of water for every ton of ore processed in the gravity and <br />flotation concentration circuits. Fresh water will be intro- <br />duced into the milling process in the grinding circuit Isee <br />Figure 1). Most of the water that will be used in grinding and <br />classification, and in the gravity concentration circuit, will <br />be recycled from the thickener tank overflow launder back to <br />the ball mill. Fresh water will also be added to the thick- <br />ened pulp as it passes from the thickener tank underflow to <br />the flotation concentration circuit. A closed circuit has ~~ <br />-.been planned to recycle the water that will accompany the . <br />tailings pumped from the mill to the tailings retention~~ <br />~~structure. The excess water that accumulates in the tailings <br />pond will be decanted from the water pool and stored under- <br />" ground in the Hazel A. adit. A steel pipe with water decant <br />holes will be used to remove the excess water that collects in <br />the tailings pond. This decantation line will be used to <br />control the water level in the tailings pond, and to keep the i <br />water pool as far as possible from the crest of the embank- <br />ment. Additional sections of steel pipe will be connected to <br />the decantation line to regulate the elevation of the water <br />pond as the tailings dam's height is increased. Several seep <br />rings will be attached to the steel pipe to prevent the <br />tailings from piping along the decantation line. The decan- <br />tation line will be connected with the Hazel A. adit through <br />one of the test holes that were drilled by the U.S. Bureau of ,. <br />Mines. This underground storage area will be used to clarify <br />.the decanted water by allowing it to settle prior to recycling <br />the water through the mill. It will also provide additional <br />reservoir capacity for the excess water removed from the r$-. <br />tailings pond. <br />~•;The amount of water that will be decanted and stored under- <br />~,~~ground in the Hazel A. adit will be primarily determined by <br />'the water balance maintained throughout the processing and <br />impoundment system. The water consumed in the milling process <br />and lost in evaporation from the tailings pond is not expected <br />~~to exceed 20 percent of the water used in the mill. The water i~~m. <br />consumed in the ore milling process will mainly result from <br />water entrapped in the gravity and flotation concentrates and <br />in the unconsolidated tailings. Because of the altitude and <br />limited size of the tailings pond, only a relatively small <br />amount of water is expected to be lost due to evaporation. <br />•~•';Recyc ling the mill water will reduce the amount of fresh water ~~ <br />needed in the milling process, and decrease the quantity of ,~ <br />,mater pumped from Left Hand Creek. <br />Because of the hillside location selected for the tailings <br />impoundment structure, water runoff inflow will not be sub- <br />stantial. A drainage diversion ditch will be excavated above <br />the tailings pond to intercept surface water runoff and convey <br />it away from the tailings impoundment area. <br />A seepage collection ditch will also be excavated around the <br />downstream perimeter of the tailings embankment dam. The <br />water that collects in this ditch will be conveyed by a <br />pipeline to the Hazel A. adit for underground storage and will <br />be recycled through the milling facility. <br />-15- <br />