Laserfiche WebLink
`~ . <br />• ! ~ <br />_ i <br />-3- <br />SCHEDULE TO NOTICE OF VIOLATION <br />Notice of Violation No. NOV r_90-035 <br />NATURE OF VIOLATION: <br />Failure to design, construct, and maintain appropriate sediment control measures <br />for topsoil stockpiles 8 and 13 in order to prevent additional contributions of <br />sediment to streamflovr or runoff outside the permit, area, and to minimize erosion <br />and provide protection for topsoil. <br />ACT, REGULATION, OR PERMIT PROVISION(S) VIOLATED: <br />ACT SECTION(S) 34-33-120{2)(~)(II); 34-33-120(2)(e) <br />REGULATION SECTION(S) 4.05.5(1)(a) and (c}; 4.06.3(2)ba){i) <br />PERMIT SECTION(S) Tab 22, Page 22-6, Seed I41x ~3 section. <br />PORTION OF THE OPERATION TO WHICH THIS NOTICE APPLIES: <br />Topsoil stockpiles 8 and 13. <br />STEPS NECESSARY TO ABATE VIOLATION (REMEDIAL ACTION): <br />1} Submit a plan to control sediment from topsoil stockpiles 6 and 13 and minimize <br />erosion on the stockpiles. <br />2) Complete the plan by October 31, 199C. <br />TIME FOR ABATEMENT (NOT MORE THAN 90 DAYS): <br />ON OR BEFORE see below ~ :j'}`( <br />Step 1 ahatement by September 14, 1990. <br />§tep Z abatement by October 31, 199G. <br />(Rev. 5/85) <br />Doc. No. 221 <br />