My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-03-24_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2004-03-24_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:27:12 PM
Creation date
11/21/2007 12:58:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
Revision
Doc Date
3/24/2004
Doc Name
Final Stamped Rpt for the new Storke Water Return System
From
Climax Molybdenum Company
To
DMG
Type & Sequence
TR7
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
297
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REMAINING WORK <br />There is a small amount of work remaining to be completed on this project. Due <br />to deteriorating weather conditions (snow) at the end of the project, not all work was <br />completed. None of the work remaining to be done affects the ability of the Storke <br />pipeline to safely convey mine water. <br />^ The following items remain to be completed: <br />' Install 18-inch ADS culverts across the pipeline along the bench for <br />stormwater management. <br />t Install marker posts at the culverts. <br />' Install protective bollards around the cleanout ports and Discharge Vault. <br />• Install rubber sheets under the HDPE pipe at the concrete supports in PT. <br />' Add ahold-down strap to the drainpipe at #5 Shaft. <br />' • Notch the fiberglass grating in the PT sump to allow for installation of the <br />sump pump. <br />_ Add a Yrinch opening bird screen to the vent pipe at the Discharge Vault. <br />• Add protective caps to valve operator stems. <br />• Wrap the Dresser couplings at the 24-inch HDPE discharge connection <br />with polyethylene sheets. <br />• Excavate an overFlow Swale at the Discharge Vault. <br />• Perform final grading of the project area. <br />• Perform final clean up in all project areas. <br />• Re-seed disturbed areas around the project site (this work is to be <br />performed by Climax). <br />The Contractor is aware that this work is still outstanding, and has agreed to <br />complete this work as soon as the weather permits in spring 2004. <br />12 <br />