My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-10-22_REVISION - M1980080
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1980080
>
2007-10-22_REVISION - M1980080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 11:41:42 AM
Creation date
11/21/2007 12:56:32 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980080
IBM Index Class Name
Revision
Doc Date
10/22/2007
Doc Name
Reclamation cost update
From
DRMS
To
Grand Junction Concrete Pipe Co.
Type & Sequence
SI1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine Total Fleet Size Haul Trip Return Trip <br />Description Cost/hour/unit (No. units) Cost/hr/Fleet CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $47.52 1 $47.52 $47.52 <br />-Light Duty Pickup, 4x4, 3/4 T. $30.93 1 $30.93 $30.93 <br />Subtotals <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Grand Junction <br />Transportation Cvcle Time ~ Non- Total one-way travel distance : 35.0 miles <br /> Roadable Roadable Average travel speed : 55.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.64 0.64 Total non-roadable mob/demob cost' : $1,170.67 <br />Return time (hours) = 0.64 0.64 • two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost `* : $99.84 <br />Unloading time (houf5) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 2.27 1.27 <br /> <br />JOB TIME AND COST Total job time : 4.55 hours <br /> Total job cosi : $1, 271 <br />
The URL can be used to link to this page
Your browser does not support the video tag.