Laserfiche WebLink
CIRCES Cost Estimatinst Software <br />PROJECT IDENTIFICATION <br />Task # : 02a <br />Date : >0/19/2007 <br />User: THM <br />State :Colorado <br />County :Garfield <br />Site :Una Pit <br />PermiUjob# : M-1980-080 <br />Abbreviation :none <br />Filename : M080-02a <br />Agency or organization name :DRMS <br />Permit or other job action :Final Reclamation Costs Update-2007 <br />Task description :Spread out topsoil and other stockpiles in plant area <br />HOURLY EQUIPMENT COST <br />Basic machine :Cat D8R Series II - 8SU (200: Horsepower : 310 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $57.13 NA <br /> Operating cosUhour : $77.13 100 <br /> Ripper op. cosUhour : $1.68 25 <br /> Operator cosUhour : $32.78 NA <br /> Total unit cosUhour : $168.71 Total fleet cosUhour : $168.71 <br /> <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 47,000 LCY factor : NA volume : 47,000 LCY <br />Source of estimated volume :Staff estimate of stockpile quantities <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 100 feet <br />Unadjusted hourly production : 852.6 LCY/hr <br />Material consistency description <br />Consolidated stockpile <br />Average push gradient : 2.00 % (r <br />Average site altitude : 5,000 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Too Soil <br />Operator skill : 0.75 (avg.) <br />Material consistency : 1.00 (Cat HB <br />Dozing method : 1.00 (gen.j <br />Visibility : 1.00 (avg.) <br />Job eff ciency : 0.83 (l shift/d~ <br />Spoil pile : 0.80 ((nd-rf) <br />Push gradient : 1.05 (Cat HE <br />Altitude : 1.00 (Cat NE <br />Material weight : 1.44 (Cat HE <br />Blade type : 1.00 (S/SU/L <br />Net correction : 0.75 <br />Adjusted unit production : 638.38 LCY/hr <br />Adjusted fleet production : 638.38 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Tolal job time : 73.62 Hours <br />Unit cost : $0.264 /LCY Total job cost : $12,421 <br />