My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31310
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31310
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:42:59 PM
Creation date
11/21/2007 12:56:23 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982056
IBM Index Class Name
Enforcement
Doc Date
10/3/2006
Doc Name
E-mail Regarding NOV
From
DRMS
To
Twentymile Coal Company
Violation No.
CV2006006
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
discuss the specifics of what's been abated, what's left to abate, and the remaining <br />abatement deadlines on Monday Oct 2nd when you return from your vacation. <br />I have extended the deadlines on Step 5, Steps 6a through 6f, and Step 7 to Monday Oct <br />2nd. Before extending these deadlines beyond this date, I would prefer that you and I <br />discuss on Monday what remedial actions have occurred at the mine site since your last <br />communication (below). <br />A Modification Notice (changing the original Step 6 into new Steps 6a-6f) and an Extension <br />of Time For Abatement Notice (extending the Sept 29 2006 deadlines for Steps 5, 6a-6f, and <br />7 to Oct 2, 2006) were faxed to you today. <br />These Notices will be put in the mail as well. <br />Dan <br />-----Original Message----- <br />From: Jerry Nettleton [mailto:JNettleton@peabodyenergy.com] <br />Sent: Thursday, September 21, 2006 5:28 PM <br />To: byron.walker@state.co.us; david.berry@state.co.us; daniel.hernandez@state.co.us <br />Cc: Mike Ludlow; Dave Wallace; mberdine@peabodyenergy.com; bwatterson@peabodyenergy.com; <br />jshoemaker@peabodyenergy.com; Brickley Cowman <br />Subject: Twentymile Coal Company - Foidel Creek Mine, NOV CV-2006-006 Abatement and <br />Extension Request <br />Byron <br />I received the final copy of the above-referenced NOV today, and was disappointed that <br />several of the abatement provisions had been substantively changed subsequent to our on- <br />site discussions. The changes result in conditions for two of the abatement provisions <br />that we cannot realistically meet within the identified abatement timeframes. The <br />following summarize our status and concerns re: the identified abatement <br />provisions: <br />Step 1: Cease discharge of Thickener underflow to Pond E - Discharge was cut-off at the <br />time the coal fines discharge was discovered (prior to 10:00 AM on 09/11/06, as documented <br />by your field observations. <br />Step 2: Repair the Thickener Pipe - The thickener pipe was repaired later in the same day <br />(09/11/06), as documented by your field observations. <br />Step 3: Perform immediate damage control activities on Foidel Creek - These activities <br />were performed immediately after notification of the coal fines discharge on 09/11/06, as <br />documented in my e-mail of 09/12/06 and confirmed by your field observations. <br />Step 9: Notify the CDPHE-WQCD, CDOW, and USACE - These agencies were notified by phone on <br />09/12/06, with copies of follow-up communications provided to the CDRMS. A representative <br />of CDOW visit the site on 09/14/06 <br />Step 5: Notify downstream users from the Pond E discharge to the confluence of Trout <br />Creek with the Yampa River - Based on a list from the CDWR provided on 09/19/06, attempts <br />were made to contact the identified water users by phone, followed by mailing of a <br />registered mail notification on the same date (copies of registered mail receipts <br />attached). <br />Step 6: Assess discharge and receiving water quality, contain the coal fines discharge, <br />and assess potential toxicity. Provide an estimate of the slurry volume discharged. <br />Submit a writted report of such assessments - Immediately on notification of the <br />discharge, a sample of the coal fines discharge was obtained at the Pond E outlet prior to <br />sealing the discharge structure. A sample was also obtained just beyond the identified <br />downstream limit of coal fines migration (both of these samples were obtained on <br />09/11/06). We initiated a daily sampling program for several downstream points the next <br />day (09/12/06), continuing through present. The coal fines discharge was contained <br />through sealing of the Pond E discharge structure and the emerfgency containment <br />activities identified under Step 3, on 09/11/06. Potential toxicity was assessed on <br />09/11/06 and 09/12/06 through review of the MSDS sheet for the flocculant used and through <br />contacts with the flocculant manufacturor re: any potential aquatic toxicity (copies of <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.