Laserfiche WebLink
iii iiiiiiiiiiiiiiii <br />• <br />BATTLE MOUNTAIN RESOURCES, INC. <br />RECEIVED <br />NOV 0,7 1999 <br />October 31, 1999 <br />Mr. Jim Dillie <br />State of Colorado <br />Division of Minerals and Geology <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project, Permit No. M-88-1 12 <br />Preliminary West Pit Cos[ Es[ima[e <br />Dear Mr. Dillie: <br />Attached is a preliminary cost estimate for West Pit water management alternatives as <br />presented in Technical Revision Twenty-six (TR-26) and/or subsequent TR-26 comment <br />responses/ discussions. These cost estimates provide third-party estimates for the capital <br />construction and annual operation and maintenance costs associated with the various <br />alternatives presented. <br />Following review of the attached if Mr. Zumwalt or myself can be of any further <br />assistance clarifying comments or questions, please do not hesitate in contacting either of <br />us. <br />Sincerely, / <br />,~~ <br />III Lyl~ `~ <br />Direc[dr of Env. Affairs <br />U.S. Operations <br />A SUBSIDIARY OF BATTLE h10UNTAlN GOLD COMPANY <br />P.O. Bux 310 San Luis. Colorado S 1152-0710 (719) 672-4I?2 Fax (719) 67?-3363 <br />