Laserfiche WebLink
<br />HOURLY PRODUCTION <br />HaullnsJ Capacity shoal 2 of 2 <br />Scraper Payload (weryhq Basrs Scraper Bowl (voiumel Basls <br />Matenal weight 2.100 poundslLCY Struck volumo 14.00 LCY <br />Material doscnption Heaped volumo 20.00 LCY <br />Shale Average volumo 17 00 LCY <br />Rated paybarf 48,000 pounds Adjusted capacity 17.00 LCY "' <br />Paybad capacity : 22.86 LCY ~ •• Dc,u'v wa;~.:.ta, n~•~car. roh n~.~ ~o~+.m:rr n,a~ ia~ ~_,~-,a<~dr nvHan <br />Cycle Timo : Job Condition Corrocttons : Site albtudo (tt.) : 5.000 <br /> Scraper Push donor Sourco <br />Scraper bading lime' : 1.50 minutes AIIiWcto adj.: f.000 <br />~ NA (Cat HB) <br />Maneuver and sproad time : 0.60 minutes ~ Job efficiency E O.B30 NA (Cot HB) <br />' luau brnA per uropa oor on pusnpull models ~I Net CORBCUOn ~ 0.830 NA <br /> <br />Retum route : _ _ minutes <br />f 200 -5.00 500 O.t)D 2927 0.16 <br />2 700 0.00 5.00 5.00 2814 0.25 <br />_. ~ _ <br />•• treed bins to each eepmant.s adµntea br acoelereb«,rdewbr.bon Ralum Ume : <br />0.11 <br />minUles <br />lohla wfIOCliles am mw unawfie peg total rm~flanca sMan, rot ovorapa <br />Total scraper team cycle 8me (load + haul + maneuver and sproad + rotum) : 2.93 minutes <br />Unadjusted unit producuonfiour : 347.90 LCYihour •" Adjusted for job conditions : 288.75 LCYRIOUr <br />Opllmat number of scrapers per push dozer : NA Selected number of scrapers : 3 scraper(s) <br />Adjusted single scraper team (unit) ttoudy production : 865 28 LCY,mour <br />Adjusted multiple scmper foam (fleoq Mudy production 866.28 LCYfiour <br />JOB TIME AND COST <br />Fleet sire 1 foam(s) Total job time 342.04 Hours <br />UnitcosL 51.288 .LCY Total jobcosl 5381,560 <br />Travel Ilme <br />Road condition descriplbn :Runed dirt, hole mainlenence, no wafer, 2'tire penetration <br />