My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ENFORCE31172
DRMS
>
Back File Migration
>
Enforcement
>
ENFORCE31172
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:42:55 PM
Creation date
11/21/2007 12:53:50 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981047
IBM Index Class Name
Enforcement
Doc Date
3/26/1993
Doc Name
BENCH SLUPM PERMIT C-81-047
From
MINREC INC
To
DMG
Violation No.
CV1993033
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINREC, INC. <br />2768 COMPASS DRIVE, SUITE 101 <br />GRAND JUNCTION, COLORADO 81506 <br />PHONE: (303) 245-4101, FA 242-7908 <br />BLUE RIBBON MINE <br />March 24, 1993 <br />C. E. Johnston <br />Division of Minerals and Geology <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bench Slump <br />Permit C-81-047 <br />Dear Ms. Johnston: <br />III IIIIIIIIIIIIIIII <br />999 <br />RECEIVED <br />MAR 2 6 1993 <br />Division ct m~ne~sis z=:ieology <br />Page 113i of the permit requires that the upland slope (stabilized <br />mine bench) above Hubbard Creek be checked annually after snowmelt <br />to determine if the area is in a stable configuration. During a <br />March 23, 1993 inspection, it was noted that a portion of the <br />stabilized mine bench had slumped. <br />Because the face of the bench is completely saturated, the repair <br />cannot be performed for some time. The 1988 and 1989 slumps were <br />repaired during July and October respectively. The working <br />conditions for the 1989 repair were more favorable than in 1988 <br />because the cover material had dried more thoroughly. <br />A plan which will outline the corrective measures to be taken and <br />how and when the area is to be repaired will be submitted to the <br />Division by the end of June. I anticipate that the repair work <br />will be performed during September or October. <br />Please call if you have any questions. <br />Sincerely, <br />., ~~~ <br />" Jim Stover, P.E. <br />Chief Engineer <br />
The URL can be used to link to this page
Your browser does not support the video tag.