Laserfiche WebLink
4) Conduct the reclamation of the north pit, south pit and the other areas absorbed into <br />the gravel pit. <br />5) After reclamation of these areas, a second bond request will be filed with the DMG <br />for Phase 1 reclamation (backfilling and grading) of the permit area. This will release <br />approximately 65% of the remaining bond. If there is evidence [hat the development of <br />the property is occurring or will soon occur, the DMG may release the entire bond and <br />full liability for the coal permit would be removed. <br />Sincerely, <br />~~ ~~~? < <br />Greg Lewicki, P. E. <br />Greg Lewicki and Associates <br />cc: Harry Ranney <br />