My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1989-05-17_REVISION - M1981302 (10)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981302
>
1989-05-17_REVISION - M1981302 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/9/2022 3:50:58 PM
Creation date
11/21/2007 12:50:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981302
IBM Index Class Name
Revision
Doc Date
5/17/1989
Doc Name
FILE M-81-302 DEEPE FARM PIT COMPLETE REVISION
From
MLRD
To
FLATIRON SAND AND GRAVEL CO
Type & Sequence
AM1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLICATION INSTRUCTIONS <br /> COMPLETE BLANKS OF THE NOTICE AS DESCRIBED IN THESE INSTRUCTIONS. <br /> DATE OF COMMENCEMENT AND DATE OF COMPLETION SHOULD REPRESENT THE DATES WHICH <br /> YOU FEEL MOST ACCURATELY DESCRIBE THE LIFE OF THE OPERATION. <br /> FOR LIMITED IMPACT (110) OPERATIONS, THE FINAL DATE FOR RECEIVING COMMENTS IS <br /> 5 DAYS AFTER DATE OF LAST PUBLICATION OR PRIOR TO 48 HOURS BEFORE THE BOARD <br /> MEETING, WHICHEVER COMES FIRST. FOR ALL REGULAR (112) OPERATIONS, THE DATE IS <br /> CALCULATED BY ADDING 20 DAYS TO THE DATE OF THE FOURTH PUBLICATION. <br /> FOR LIMITED IMPACT (110) OPERATIONS, THIS NOTICE MUST BE PUBLISHED TWICE, ONE <br /> WEEK APART, THE FINAL DATE OF PUBLICATION BEING NO LATER THAN 48 HOURS PRIOR <br /> TO THE DATE FOR BOARD CONSIDERATION OF THE APPLICATION. FOR REGULAR (112) <br /> OPERATIONS, THIS NOTICE MUST BE PUBLISHED ONCE A WEEK FOR FOUR CONSECUTIVE <br /> WEEKS, THE FINAL DATE OF PUBLICATION BEING AT LEAST TWENTY DAYS PRIOR TO THE <br /> DATE FOR BOARD CONSIDERATION. ALL NOTICES MUST BE PUBLISHED IN A NEWSPAPER OF <br /> GENERAL CIRCULATION IN THE LOCALITY OF THE PROPOSED MINING OPERATION. SINCE <br /> THE DATE FOR CONSIDERATION OF YOUR APPLICATION MAY CHANGE, DO NOT INCLUDE IT <br /> IN THIS NOTICE. <br /> FOR A COMPLETE DISCUSSION OF THE NOTICE PROCEDURES AND OBJECTIONS, PLEASE <br /> REFER TO RULES 2. 2 AND 2.3 FOR REGULAR OPERATIONS AND RULES 3.2 AND 3.3 FOR <br /> LIMITED IMPACT OPERATIONS. <br /> ------------------------------------------------------------------------------- <br /> PUBLIC NOTICE <br /> Flatiron Sand & Gravel Company; Box 229; Boulder, CO 80306, (303) 444-2151 <br /> has filed an application for a Mining and Reclamation permit with the Colorado <br /> Mined Land Reclamation Board under provisions of the Colorado Mined Land <br /> Reclamation Act. The proposed mine is located at or near Section 16.0, <br /> Township 1 .0 S, Range 68.0 W, 06th Prime Meridian. <br /> The proposed date of commencement is and the <br /> proposed date of completion is fie roposed <br /> future use of the land is rangeland. itiona information and tentative <br /> hearing date may be obtained from the Mined Land Reclamation Board, Room 215, <br /> 1313 Sherman Street, Denver, Colorado 80203 (303) 866-3567, or Boulder County <br /> Clerk & Recorder; Box 471 13th & Spruce Sts; Boulder, CO 80306 or the <br /> above-named applicant. <br /> Written comments must be received by the Mined Land Reclamation Board by <br /> 5:00 p.m. on , 19 <br /> (Month, Day, ear) <br />
The URL can be used to link to this page
Your browser does not support the video tag.