Laserfiche WebLink
PUBLICATION INSTRUCTIONS <br /> COMPLETE BLANKS OF THE NOTICE AS DESCRIBED IN THESE INSTRUCTIONS. <br /> DATE OF COMMENCEMENT AND DATE OF COMPLETION SHOULD REPRESENT THE DATES WHICH <br /> YOU FEEL MOST ACCURATELY DESCRIBE THE LIFE OF THE OPERATION. <br /> FOR LIMITED IMPACT (110) OPERATIONS, THE FINAL DATE FOR RECEIVING COMMENTS IS <br /> 5 DAYS AFTER DATE OF LAST PUBLICATION OR PRIOR TO 48 HOURS BEFORE THE BOARD <br /> MEETING, WHICHEVER COMES FIRST. FOR ALL REGULAR (112) OPERATIONS, THE DATE IS <br /> CALCULATED BY ADDING 20 DAYS TO THE DATE OF THE FOURTH PUBLICATION. <br /> FOR LIMITED IMPACT (110) OPERATIONS, THIS NOTICE MUST BE PUBLISHED TWICE, ONE <br /> WEEK APART, THE FINAL DATE OF PUBLICATION BEING NO LATER THAN 48 HOURS PRIOR <br /> TO THE DATE FOR BOARD CONSIDERATION OF THE APPLICATION. FOR REGULAR (112) <br /> OPERATIONS, THIS NOTICE MUST BE PUBLISHED ONCE A WEEK FOR FOUR CONSECUTIVE <br /> WEEKS, THE FINAL DATE OF PUBLICATION BEING AT LEAST TWENTY DAYS PRIOR TO THE <br /> DATE FOR BOARD CONSIDERATION. ALL NOTICES MUST BE PUBLISHED IN A NEWSPAPER OF <br /> GENERAL CIRCULATION IN THE LOCALITY OF THE PROPOSED MINING OPERATION. SINCE <br /> THE DATE FOR CONSIDERATION OF YOUR APPLICATION MAY CHANGE, DO NOT INCLUDE IT <br /> IN THIS NOTICE. <br /> FOR A COMPLETE DISCUSSION OF THE NOTICE PROCEDURES AND OBJECTIONS, PLEASE <br /> REFER TO RULES 2. 2 AND 2.3 FOR REGULAR OPERATIONS AND RULES 3.2 AND 3.3 FOR <br /> LIMITED IMPACT OPERATIONS. <br /> ------------------------------------------------------------------------------- <br /> PUBLIC NOTICE <br /> Flatiron Sand & Gravel Company; Box 229; Boulder, CO 80306, (303) 444-2151 <br /> has filed an application for a Mining and Reclamation permit with the Colorado <br /> Mined Land Reclamation Board under provisions of the Colorado Mined Land <br /> Reclamation Act. The proposed mine is located at or near Section 16.0, <br /> Township 1 .0 S, Range 68.0 W, 06th Prime Meridian. <br /> The proposed date of commencement is and the <br /> proposed date of completion is fie roposed <br /> future use of the land is rangeland. itiona information and tentative <br /> hearing date may be obtained from the Mined Land Reclamation Board, Room 215, <br /> 1313 Sherman Street, Denver, Colorado 80203 (303) 866-3567, or Boulder County <br /> Clerk & Recorder; Box 471 13th & Spruce Sts; Boulder, CO 80306 or the <br /> above-named applicant. <br /> Written comments must be received by the Mined Land Reclamation Board by <br /> 5:00 p.m. on , 19 <br /> (Month, Day, ear) <br />