Laserfiche WebLink
STATE O~ COLOR,ADO <br />sill Owens. Governor , <br />)one E. Nown, faecmive Uirettpr <br />Dedleaf4d to proterling and lmprovinr the health and envimnmenf of the peopl¢ol COlprada ~ <br />4J0o Cherry Creek Dr. S. Laboratory and Radlafnn Smkes Uivhlon ~ <br />e <br />e <br />Denver Cebrado BU246~1570 B7UOlwvry Blvd. s n s <br />rhone OOJ) h92~200e thnve., Colorado a0r 3U-4929 <br />TDD Line 13031691 -7JW 13V3169d-3U9U ColOradO DePamaeat <br />Located in Glendale, Colorado ofPublic j~tt-ld] <br />hxpJ/wnv.cdphesrate,cp.w sad Etlrllaamen[ <br /> ACTJON: APEN EXEMPTED <br /> ' PERMIT BXEMPTED <br />Am7: Jim Rrakel <br />Jlm & Beckie Xrakel <br />Y.O. Box 732 <br />Wellington, Ct7 8050.9 <br />RE: Permit Application No. 94LR628F far mining operations <br />Dear Jint Krakel, <br />The Air Pollution Control Division (the Dirisioa) lies reviewed your emission permit applicatlonNo.94LR6Z8F for <br />the send end gravel pit (mown as Russell Gravel Pit, located at 1 mile north of County Road 70 and bast Frontage <br />Road of I-25, Lorimer County. Colorado. <br />The above emission point is exempt from the ding of Air Pollutant Emission Notice(s). (APENs), and is also exempt <br />from permit requirements (per Regulation No. 3, Part A, Settian ILD. La, and Part B, Sec[ion IILD.I.a). <br />This exempfiaa from ADEN and permit requirements is issued in rolisnee upon the accuracy and completeness of <br />information supplied by the applicant and is conditioned upon construction, installation and operation in <br />accordance with this infoneadon end with represenrationsmade by tiro applicant or applicanf s agenp. <br />Specifically, this exempdoa has been granted provided that the followiag information is accurate and complete: <br />AMUal uncontrolled emissioa of Partlculote Metter less than 10 mieroas (PM-10) b lass than Z loos <br />per year. <br />Raw material remavW from the plt does not exceed 10,500 toes per year. <br />Any changes with respect to the original submittal which would result in an increase in actual uncontrolled TSP <br />emissions above 2 tons per year automatically nullifies this exetttpdon. Before actually making arty such change, <br />you must apPIY to the Division for a construction permit based on the anticipated change. A permit must be <br />obtained BEFORE implementing the change. <br />It ahvuld ba noted that altfiough exempted sources may not need air emission permits, tlLry still are required to <br />meet alI applicable standards end regulations of the Air Quality Control Cominisaitm, including vtrib/e eanissionr <br />ilrap not exceed 10% opacity and no a~(jproperry rnnaporr guideJtnes ojRegulation No. I SeeHon III.D.Zb. <br />069IU2871001 vor. 2100 <br />_..---- <br />FFYD SSP ----•----~-------~-----...---- <br />F,9-: [d~,7,-;f'?-rl,',7R rmr t4 xMll 1n:r1~1 P ~-=. <br />Page 30 <br />