My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-07-23_REVISION - M1994096 (2)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1994096
>
2004-07-23_REVISION - M1994096 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 6:06:04 PM
Creation date
11/21/2007 12:50:44 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1994096
IBM Index Class Name
Revision
Doc Date
7/23/2004
Doc Name
First Submittal of Appl
From
High Plains Sand and Gravel LLC
To
DMG
Type & Sequence
CN1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~' <br />The mined arts will be ralaimed a cropland or pasture as it is mined out, and consistent with the Statc <br />Mined land Ralamadon Boats approved reclamation plan. The project is also approved for a <br />residential uu Nat is accessory to the opuation of the tome. The site plan shows 4.39 acres set-aside for <br />Ne residential use, end for support sWCtures for the associated wiN the residrntial use and for the <br />stongc ofequipment Cor the mine. In addition, the applicant <w operate a batch plwl, with the <br />limitations subject a the coadinons ofapproval. <br />3. Residual Laud Restriedoua. Tha Russell Gravel Pit does no[conuin any rcsiduallwd. <br />0. Cauditloos of Approval Applicant agree Nat Ne following conditions listed in the Findings and <br />Resolution for ini»al approval of this development remain a be wmplnedand/or conrinne to apply: <br />A. Operation of the Russell Gmvel Pit Spaiai Review sball he as specified in Ne rWtaenations of <br />Ne applicant and in Ne intomsation contained in fit<f101.21396, unless modified by Neu <br />comditlona a(approval. <br />B. The operator shall provide the Lorimer County Planning Depamnrnt a copy of then annual report to <br />the State that details overall compliance with Ne atormwater mwagem<nt plan and a wpy of the <br />annual report required by Ne State Mined land RedamaLon Boazd (MLRB). <br />C. The approval of the Russell Pit Special Review 00.21396 shall be null and void if, at any time after <br />Ne date ofapproval by Ne Board afCounty Commissioners, the subject mining op<mfion <br />ubstwtially ceases for wy pedad of 3 consecutive years. <br />D. Asmual produc0on shall na exceed dg, 000 aro. if tfie operator intends a inacase Ne amount oC <br />ttmterial removed at Ne site above 24,000 ens annually, Ne opmtor must submit a modified site <br />plan, update all applirable State permits, update Ndr trams impact report and paY Ne increased <br />County Capita Transportation Expansion Fee. <br />E. The Applicant afiall obtain all required State and/or Federal pemdts (including Ne State Air <br />Emissions Permit or exemption letter, the State Sannwater Discharge Permit, and the Slate Secton <br />112 Ralamatiou Permit. The applicant shall provide espies ofpermi6 or wthorirations to the <br />Planning Depatlmen[ for Ne file within 60 days oCNtir approval from the Stet. The permits shall <br />rc0ent Ne yearly maximum tonnage as approved by Ne Board of County Commissioners. The <br />appiitam must also obtain a Lorimer CGUnty access permit Cor Ne residential use, and pay Ne <br />Tronsportauon Capiml Expansion Fa as determined by the County Enginar within 60 days oftheir <br />approval, unless en appeal m Nis tee is approved by the Board of County Commissioners. <br />F. The quarry and processing operations sfiall comely wiN Ne requiremma of the Ordiwnce <br />Concertting Noise I.ev<Is in Unincorporated Lorimer County (Ordinance No. 97-3). <br />G. All distudsW eaeas,'uwluding haul roads, atoc6piles wd processing azeas shat] be graded so Net <br />stormwater is directed a Ne oo-site holding ponds. <br />H. Concurrent reclamation, as slated in Nc submitted materials and requirtd as pan of the Stan Section <br />I l2 Ralamation Permit, shall lK performed so that Ne maximum amount of duturbed area does not <br />exceed Ne acreage in each phase u shown on Ne site plan by Stewart wd Associates, dated 10-09- <br />OI and attached to Neir site plan. <br />auttell Gravel pi,Spttial0.sview, Dev. Ag (LCPP-12], OYlIM) <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.