Laserfiche WebLink
III IIIIIIIIIIIIIIII~ <br />999 <br />Mountain Coal Company <br />West Elk Mine <br />Post Office Boz 597 <br />Somerset, Cobredo 81434 <br />Telephone 970-939-3013 <br />July 16, 1996 <br />Mr. Michael Long <br />Director, Colorado Division of Minerals & Geology <br />1313 Sherman Street, Room 215 <br />Denver, Colorado 80203 <br />RE: Mountain Coal Company, Notice of Violation C-96-013 <br />Dear Mr. Long: <br />/\ <br />\/ <br />RFrFivED <br />JUL 2 2 1996 <br />DIVISion of Minorpla S Geoio7Y <br />On June 18, 1996, the Colorado Division of Minerals & Geology (Division) issued Notice of <br />Violation (NOV) C-96-013 to Mountain Coal Company's West Elk Mine, located near Somerset, <br />Colorado. The NOV alleges that three distinct events constituted a violation of Division <br />regulations: <br />] . Extraction of a stuck bulldozer on the mine's lower refuse pile <br />2. Relocating a stockpile atop the mine's lower refuse pile <br />3. Mixing refuse and previously distributed subsoil during the reconfiguration of the <br />lower refuse pile <br />In fact, none of the events warranted issuance of the NOV. <br />1. Stuck Bulldozer <br />Prior to the inspection that gave rise to the NOV, a bulldozer became stuck attempting to cross a <br />drainage ditch on the east refuse pile bench. The dozer became stuck because it was crossing a <br />drainage ditch at the toe of the steep slope. It did not become stuck because of overall wet <br />conditions. The extraction of the bulldozer churned up some refuse material which mixed with <br />suitable cover material in the vicinity of the drainage ditch, but this impact was inconsequential, <br />and caused no material impact to any soil resource. The Inspection Report implies that the dozer <br />became stuck because it was "working in wet conditions." It was not. The mine's permit, in <br />Exhibit 51, prohibits moving topsoil or subsoil in wet conditions. That requirement is designed to <br />assure that the operator will not lose soil resources by moving wet soils in rainy weather. <br />Mountain Coal at no point attempted to move topsoil or subsoil during wet conditions. This <br />permit condition does not mean that an operator is subject to an NOV simply because there is an <br />incidental contact with water at the mine site. <br />