Laserfiche WebLink
.au of the stock tanks at the Seneca 1l-W mine were full of sediment, and require cleaning. Along the G-haul road, <br />the rock spillway on T-22 was washed out, and has not changed since the last inspection. Some minor repairs on <br />the G-road were noted, but extensive erosion has occurred on all road ditches and permanent drainages. All of this <br />disturbance was noted in the previous inspection report, and is collected in Pond 005. The haul road G ditches <br />have down cut roughly 2 feet to 5 feet above G-5 culvert. The natwal drainage above and below G-5 culvert has <br />eroded to a depth ranging from 5 feet to IO feet. This entire drainage requires repair. The ditch above Culvert G-3 <br />has down cut roughly t to 2 feet and requires repairs. <br />The operator has yet to completely install the rip-rap on the B-Pit NOV drainage. Rock has been piled, but weather <br />conditions have delayed reestablishing the drainage. The entire drainage on the B Pit needs to be repaired. Heavy <br />rains have downcutted the channel to a depth of 2 feet. The lower portion of 006 drainage also needs to be <br />repared. Heavy rains have washed the rock from the channel. <br />Backfilling & Gradine Backfilling and grading in the A-Pit appears to be complete for this year. The C-Pit has <br />not been backfilled. The operator should make note that the backfilling & grading map shows the C-Pit to be <br />completed in 1997. Previous backfilled slopes appear stable. Numerous erosion features were noted throughout <br />the bacl:filled azea with the heavy precipitation this year. Repairs should be made in accordance with the rill and <br />gully Plan. <br />Exnlosives Explosive storage units were properly secured and signs posted. <br />~Qpsoil Topsoil has been stripped in advance of the A Pit and placed in existing topsoil piles. Once the piles are <br />complete, a temporary seed mix should be applied and signs put in place. It appears that all of the topsoil placed on <br />regraded areas this yeaz was live handled. Some additional topsoil needs to be removed m the upper A-Pit Area. It <br />does not appear that all of the topsoil bas been removed from this area. <br />Topsoil depths were verified in portions of the 1996 and 1997 reclaimed areas. The GPS was used to determine the <br />area of topsoil replacement as well as the sample locations. The GPS information will be provided to the operator <br />once the data is compiled The following topsoil depths were noted; <br />upper 199b Area <br />9601-15" <br />9602-19" <br />9603-27" <br />97-04- <br />Unner 1997 Area <br />9705-18" <br />9706-IS" <br />9707-13" <br />9708-10" <br />9709-10" <br />97f0-14" <br />